Willoughby Yard modifications

As alluded to in my prior post, I did not follow my plan when installing track in Willoughby Yard, so I have rerouted most of the track and am closer to the design plan. Not that close, actually, but closer than I was. I love to use Micro Engineering track spikes to hold track down. Pulling it right back up is equally easy.

Unfortunately, I ran out of spikes and have placed a new order with FastTracks. When the spikes arrive, I can reroute the remaining section of track that needs to be moved. I think this layout is a much more efficient use of space and is closer to the original drawings.

ImageImageImage

I attended the Willamette Cascade Train Show today at the Lane County Fairgrounds and took my father along for the ride. We checked  out the tables of trains, books, and everything railroad-related but did not find anything we could not live without.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s